PDF Print E-mail

Why should the system be tested BEFORE fitting the floor covering? 

The system should be tested to detect any faults/damage prior to laying the floor covering. This makes it easier to take any remedial action necessary and shows the system is in perfect working condition prior to handover (to floor fitter/householder).

 

 
< Prev   Next >
                                                                                    Tel: 01383 567059 Fax: 01383 622416                                                 Privacy Statement
Website designed and maintained by Accolade Heating Ltd 2007